27 November 2010 Trimming of tall pine tree
Hanging by a thread
Sidewalk Supervisors
22 July 2010 New Pavement on Road way and Parking lot
04 April 2010 Pictures of redecorated clubhouse
Entry
High Level Conference
Teamwork
March 2010 New Pool Furniture (Tables, Chairs, Umbrellas)
March 2010 New Kayak Racks
October 2009 One of several new Bismark Palms
11 Oct 2009 Refurbished and repainted storage shed
Refurbished Pool Lining with new depth markings. The work has been approved by the Town.
New Planting and Soaker Hose Watering System for Building #1
New Coat of Paint for the Clubhouse Deck
17 Nov 2008 Our new pool heater was installed. A 126,000 BTU AquaTherm heat pump
11-08-08 Old corrugated iron cover over the puimp housing in front of Building #2 was replaced. with a white aluminum cover.
New Cover
Paving of the pool deck and entrance to the clubhouse is done! The contractors did a great job.
Clubhouse Entrance